Responsibility:
Verify proven setup will produce parts to specification.
Resources:
Access to equipment, process plans, drawings, certified materials, Measuring and Test Equipment (M&TE), lubricants and cleaners
Performance:
  • What you do
    1. Trial running
    2. Tooling and offset adjustments
    3. Speed and feed adjustments
    4. Clearance position adjustments
    5. Lubricant adjustments
  • Decisions you make
    1. Determining if:
      1. Trial running is required
      2. Tooling and offset adjustments are required
      3. Speed and feed adjustments are required
      4. Clearance position adjustments are required
      5. Program adjustments are required
Compliance:
Full
Industry Stats

2

Surveys

100%

Acceptance

100%

Usage

Version 3 R 4
 

Role: Roll Forming Technician

Description:
Roll Forming Technicians independently set up proven jobs; load materials and thread through roll stands; run and inspect parts while monitoring and adjusting process, equipment and tool conditions.
Roles with identical duty:
Statistics:
  • Surveys - This stat is the number of surveys completed by Subject Matter Experts (SMEs)
  • Acceptance - This stat is the percentage of SMEs that accept this role or duty as Industry-Recognized
  • Usage - This stat is the percentage of SMEs that state their employer assigns this duty in the workplace